44. Work superintendent in agriculture

Quiz by Wincentre Test series

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
100 questions
Show answers
  • Q1
    The permissible error in prismatic compass survey
    1 in 120
    1 in 20
    1 in 30
    1 in 340
    30s
  • Q2
    Field work and plotting are done simultaneously in
    Chain survey
    Compass survey
    Plane table survey
    Leveling
    30s
  • Q3
    The alidade provides ...... in plane table surveying.
    Line of collimation
    Line of sight
    Centering
    Leveling
    30s
  • Q4
    .......... is the method of solving three point problems
    Trial and error
    Simpsons
    Reduction
    Resection
    30s
  • Q5
    Incorrect length of chain is ............. source of error.
    Cumulative
    Trial and error
    Short
    Negative
    30s
  • Q6
    Correction applied for pull in tape can be
    +ve
    Both
    None of these
    -ve
    30s
  • Q7
    The part of surveying which deals with the measurement in a vertical plane is
    Chaining
    Traversing
    Leveling
    Plane table surveying
    30s
  • Q8
    Reduced level of a point is its elevation with reference to.
    Ground level
    Line of collimation
    Datum
    None of these
    30s
  • Q9
    In a level tube, the larger the radius of curvature ............... is the sensitiveness.
    Minimum
    lesser
    greater
    Maximum
    30s
  • Q10
    The smallest division on the B.I.S. levelling staff is equal to
    1 mm
    5 mm
    10 mm
    2 mm
    30s
  • Q11
    If a level is in permanent adjustment, its line of collimation is parallel to the axis of the:
    Eye piece
    Tripod
    Bubble tube
    Telescope
    30s
  • Q12
    Leveling should always commence from a
    Reference point
    Permanent point
    Datum
    Benchmark
    30s
  • Q13
    The effect of refraction is ......... of that of the curvature
    1/6 th
    1/4 th
    1/7 th
    1/5 th
    30s
  • Q14
    In a theodolite the line of collimation and the axis of telescope are
    Lying in a plane
    None of these
    Different
    Same
    30s
  • Q15
    Plotting by coordinates is ....... than a plotting by direction and lengths
    more accurate
    less accurate
    accurate
    safer
    30s