  • Q1
    1. The instantaneous difference between net actual interchange and net scheduled interchange, taking into account the effects of Frequency Bias along with any deviation in frequency is defined as:
    Request one party to repeat the instruction verbatim
    Confirm reception of the instruction by two receivers of the instruction
    Request two parties to repeat the instruction verbatim
    Area Control Error
    60s
  • Q2
    2. The application of the Disturbance Control Standard is limited to :
    Loss of demand/Loss of load
    Loss of supply/ Loss of generation
    Loss of supply/Loss of load
    Loss of demand/Loss of load
    60s
  • Q3
    3. Balancing Authorities and Reserve Sharing Groups shall calculate and report compliance with the Disturbance Control Performance Standard for all disturbances greater than or equal to what percentage of the most severe single contingency?
    100%
    25%
    50%
    80%
    60s
  • Q4
    4. A Reliability Coordinator shall be notified within what timeframe if for any reason a Balancing Authority within its area is unable to calculate Area Control Error?
    30 minutes
    45 minutes
    15 minutes
    60 minutes
    60s
  • Q5
    5. Automatic Generation Control is used to routinely deploy
    Contingency Reserve
    Spinning Reserve
    Operating Reserve
    Regulating Reserve
    60s
  • Q6
    6. Each Balancing Authority shall operate such that its clock-minute average of ACE does not exceed its clock-minute Balancing Authority ACE Limit (BAAL) for more than _____consecutive clock-minutes.
    60
    30
    10
    5
    60s
  • Q7
    7. During a time error correction, the Balancing Authority shall offset its frequency schedule by ____ Hertz, leaving the Frequency Bias Setting normal.
    0.1 Hz
    0.02 Hz
    0.01 Hz
    0.2 Hz
    60s
  • Q8
    8. Which entity, either individually or jointly, shall ensure that formal procedures and policies are developed, maintained, and implemented for monitoring and controlling voltage levels and Mvar flows within their individual areas and neighboring areas?
    Transmission Service Provider
    Balancing authority
    Transmission Operator
    Reliability coordinator
    60s
  • Q9
    9. Each Transmission Operator, shall acquire sufficient reactive reserves, which includes generator reactive scheduling, ________, and ________.
    Controllable loads/ Transmission line switching
    Generator MW scheduling/ Market optimization
    60s
  • Q10
    10. ______ Transmission operators are required to correct for any violations to Interconnection Reliability Operating Limits within what time frame?
    60 minutes
    15 minutes
    30 minutes
    10 minutes
    60s
  • Q11
    11. ______ For a change in status or capability of a generator reactive power resource, the Generation Operator has 30 minutes to notify which of the following entities?
    Transmission Operator
    Balancing Authority
    Generation Owner
    Reliability Coordinator
    60s
  • Q12
    12. ______ This best describes how reactive power normally flows:
    Uphill on Voltage
    High voltage to low voltage
    60s
  • Q13
    13. According to standard VAR-001, which entity is responsible for defining voltage schedules?
    Reliability Coordinator
    Generator Operator
    Transmission Owner
    Transmission Operator
    60s
  • Q14
    14. According to VAR-002-4.1, the Generator Operator shall operate with AVR in service and controlling voltage unless instructed otherwise by the TOP or if the generator is operated in startup, shutdown or this mode.
    AGC
    Regulation
    Over-excited
    Testing
    60s