BAL, VAR
Quiz by Nghiep Hy
Feel free to use or edit a copy
includes Teacher and Student dashboards
Measure skillsfrom any curriculum
Measure skills
from any curriculum
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
With a free account, teachers can
- edit the questions
- save a copy for later
- start a class game
- automatically assign follow-up activities based on students’ scores
- assign as homework
- share a link with colleagues
- print as a bubble sheet
14 questions
Show answers
- Q11. The instantaneous difference between net actual interchange and net scheduled interchange, taking into account the effects of Frequency Bias along with any deviation in frequency is defined as:Request one party to repeat the instruction verbatimConfirm reception of the instruction by two receivers of the instructionRequest two parties to repeat the instruction verbatimArea Control Error60s
- Q22. The application of the Disturbance Control Standard is limited to :Loss of demand/Loss of loadLoss of supply/ Loss of generationLoss of supply/Loss of loadLoss of demand/Loss of load60s
- Q33. Balancing Authorities and Reserve Sharing Groups shall calculate and report compliance with the Disturbance Control Performance Standard for all disturbances greater than or equal to what percentage of the most severe single contingency?100%25%50%80%60s
- Q44. A Reliability Coordinator shall be notified within what timeframe if for any reason a Balancing Authority within its area is unable to calculate Area Control Error?30 minutes45 minutes15 minutes60 minutes60s
- Q55. Automatic Generation Control is used to routinely deployContingency ReserveSpinning ReserveOperating ReserveRegulating Reserve60s
- Q66. Each Balancing Authority shall operate such that its clock-minute average of ACE does not exceed its clock-minute Balancing Authority ACE Limit (BAAL) for more than _____consecutive clock-minutes.603010560s
- Q77. During a time error correction, the Balancing Authority shall offset its frequency schedule by ____ Hertz, leaving the Frequency Bias Setting normal.0.1 Hz0.02 Hz0.01 Hz0.2 Hz60s
- Q88. Which entity, either individually or jointly, shall ensure that formal procedures and policies are developed, maintained, and implemented for monitoring and controlling voltage levels and Mvar flows within their individual areas and neighboring areas?Transmission Service ProviderBalancing authorityTransmission OperatorReliability coordinator60s
- Q99. Each Transmission Operator, shall acquire sufficient reactive reserves, which includes generator reactive scheduling, ________, and ________.Controllable loads/ Transmission line switchingGenerator MW scheduling/ Market optimization60s
- Q1010. ______ Transmission operators are required to correct for any violations to Interconnection Reliability Operating Limits within what time frame?60 minutes15 minutes30 minutes10 minutes60s
- Q1111. ______ For a change in status or capability of a generator reactive power resource, the Generation Operator has 30 minutes to notify which of the following entities?Transmission OperatorBalancing AuthorityGeneration OwnerReliability Coordinator60s
- Q1212. ______ This best describes how reactive power normally flows:Uphill on VoltageHigh voltage to low voltage60s
- Q1313. According to standard VAR-001, which entity is responsible for defining voltage schedules?Reliability CoordinatorGenerator OperatorTransmission OwnerTransmission Operator60s
- Q1414. According to VAR-002-4.1, the Generator Operator shall operate with AVR in service and controlling voltage unless instructed otherwise by the TOP or if the generator is operated in startup, shutdown or this mode.AGCRegulationOver-excitedTesting60s