  • Q1
    What governing document discussed in the lecture details construction cost estimating philosophies and procedures?
    UFC 1-200-02
    UFC 3-740-05
    UFC 3-201-01
    UFC 4-010-10
    300s
  • Q2
    True or false? All costs, which a prudent, experienced contractor would expect to incur, should be included in the cost estimate.
    True
    False
    300s
  • Q3
    Which is not a method of estimating construction costs?
    Project Comparison
    Square Foot/Square Meter Estimating
    Quantity Take Off (QTO)
    They are all methods of estimating construction costs
    300s
  • Q4
    When do you NOT prepare a cost estimate for Military Construction (MILCON) projects?
    Construction Phase
    Design Phase
    Post-Construction Phase
    Planning Phase
    300s
  • Q5
    What is the level of accuracy for a Quantity Take-Off Estimate?
    -15% to +25%
    -25% to +40%
    -7.5% to +10%
    -10% to +15%
    300s
  • Q6
    This type of project requires cost estimates at 15%, 35%, and 65%
    Prime BEEF TTPs
    Design Build
    Design Bid Build
    MILCON
    300s
  • Q7
    True or False As long as you have accurate maps/drawings, doing a site visit is unnecessary prior to completing the cost estimate.
    False
    True
    300s
  • Q8
    Indirect costs include which of the following:
    Profit
    Labor
    Subcontracted costs
    Materials
    300s
  • Q9
    True or False The standard for Statement of Work formatting can be found on ePubs.
    False
    True
    300s
  • Q10
    True or False Cost Estimating is completely up to the Cost Engineer, and other subject matter experts should not be involved with providing assistance.
    False
    True
    300s