Q 1/10
Score 0
Accurate method among the following
30
Unit base method
Cubical contents method
Approximate quantity method
Plinth area method
Q 2/10
Score 0
Additional supervising staff engaged at work site, is called
30
Work charged establishment
Contigencies
Centage charge
Conveyance charge
10 questions
Q.
Accurate method among the following
1
30 sec
Q.
Additional supervising staff engaged at work site, is called
2
30 sec
Q.
Due to change in price level, a revised estimate is prepared if the technical sanctioned estimate exceeds
3
30 sec
Q.
If in the abstract of estimate form, the columns of rates and amount left blank then its called
4
30 sec
Q.
In a building work, for sanitary works a percentage of............the estimated cost is provided
5
30 sec
Q.
Leasor is the :
6
30 sec
Q.
_____________is the technique of estimating or determining the fare price or value of a property such as a building, a factory, other engineering structures of various types.
7
30 sec
Q.
Servient owner is the...................
8
30 sec
Q.
Annual sinking fund doesnot depends on :
9
30 sec
Q.
Under the straight line method of charging depreciation, depreciation :