placeholder image to represent content

IRO, PER

Quiz by Nghiep Hy

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
10 questions
Show answers
  • Q1
    1. In instances where there is a difference in derived limits, the Transmission Operators, Balancing Authorities, Generator Operators, Transmission Service Providers, Load-Serving Entities, and Purchasing-Selling Entities shall always operate the Bulk Electric System to which of the following?
    Most limiting parameter
    Emergency Rating
    Normal Continuous Rating
    Difference of the derived limits
    60s
  • Q2
    2. Each Reliability Coordinator that receives a request to implement congestion management actions shall, within what timeframe of receiving the request, implement the congestion management actions requested by the issuing Reliability Coordinator?
    30 minutes
    15 minutes
    60 minutes
    45 minutes
    60s
  • Q3
    3. Each Reliability Coordinator shall perform a Real-Time Assessment within what timeframe to determine if its Wide Area is exceeding any IROLs or is expected to exceed any IROLs
    Twice every 30 minutes
    Once an hour
    Once every 30 minutes
    Twice every three hours
    60s
  • Q4
    4. Reliability Coordinators must have the authority, plans, and agreements in place to immediately direct reliability entities within their Reliability Coordinator Areas to mitigate critical conditions to return the system to a reliable state. This includes taking which of the following actions?
    Increase thermal ratings/limits on equipment
    Increase thermal ratings/Reducing load
    Readministering the markets/ Reducing load
    Reconfiguring the transmission system/ Reducing load
    60s
  • Q5
    5. Which entity shall have clear decision-making authority to act and to direct actions to be taken in order to preserve the integrity and reliability of the Bulk Electric System
    Transmission Operator
    Transmission Service Provider
    Reliability Coordinator
    Generation Operator
    60s
  • Q6
    6. Whenever non-NERC certified personnel are performing any reliability-related tasks of a real-time operating position, which entity has ultimate responsibility for the performance of the reliability related tasks?
    Shift Manager
    Reliability Coordinator
    Operating Company
    NERC Certified System Operator at the operating position
    60s
  • Q7
    7. At least every 12 months each Reliability Coordinator, Balancing Authority and Transmission Operator shall provide each of its System Operators with at least how many hours of emergency operations training?
    8 hours
    32 hours
    45 hours
    16 hours
    60s
  • Q8
    8. Each Transmission Operator shall staff its Real-time operating positions performing Transmission Operator reliability-related tasks with System Operators who have demonstrated minimum competency in which of the areas listed below?
    Resource and demand balancing/ Interchange scheduling and coordination
    Voltage and reactive/ Protection and control
    60s
  • Q9
    9. PER-005 requires updating of the operator training plan how often?
    Monthly
    Weekly
    Daily
    Annually
    60s
  • Q10
    10. After an addition or modification to a task, how long do entities have to complete task-verification on the changed task?
    12 months from change to the task
    3 months from change to the task
    6 months from change to the task
    24 months from change to the task
    60s

Teachers give this quiz to your class