  • Q1
    What are the advantages of combining cards and visuals into KPIs in Power BI?
    A. Packs more information into a smaller space, providing a concise view.
    Not possible in Power BI.
    Requires more time and effort to create compared to separate cards and visuals.
    Less visually appealing than separate cards and visuals.
    30s
  • Q2
    What are the limitations of applying conditional formatting to the subtitle of a KPI in Power BI?
    Text size cannot be changed using conditional formatting.
    A. Color coding cannot be applied to individual metrics within the subtitle.
    Only positive values can be formatted with conditional formatting.
    Conditional formatting cannot be applied to subtitles at all.
    30s
  • Q3
    How can you create a dynamic title for a KPI in Power BI that updates based on the selected data?
    Titles are automatically generated based on the data used in the KPI.
    You can only use pre-defined titles for KPIs.
    Titles cannot be dynamic in Power BI KPIs.
    A. Use measures with conditional formatting to include the desired title text.
    30s
  • Q4
    What is the purpose of using a disconnected table in the creation of KPIs in Power BI?
    Disconnected tables are used to connect to external data sources.
    A. Allows for the adjustment of the reporting month used in the KPI calculations.
    Disconnected tables store data that is not used in the KPI.
    Disconnected tables are not necessary for creating KPIs.
    30s
  • Q5
    How can you change the color of the markers in a line chart when conditional formatting is not directly available for them in Power BI?
    Conditional formatting must be used to change the color of all chart elements.
    A. Temporarily switch the chart to a column chart, apply conditional formatting to the columns, and then switch back to a line chart.
    There is a separate formatting option for markers in the line chart settings.
    The color of the markers cannot be changed in Power BI.
    30s
  • Q6
    What are some considerations when applying color coding to trends in KPI subtitles in Power BI?
    There are no limitations on applying color coding to trends in subtitles.
    All metrics in the subtitle must have the same color coding.
    Color coding cannot be used for trends in subtitles.
    A. Using too many metrics in the subtitle can make the color coding difficult to interpret.
    30s
  • Q7
    How can you create a border and background for a KPI in Power BI when using a title and subtitle?
    The title and subtitle formatting options include borders and backgrounds.
    Use conditional formatting to create a border and background effect.
    Borders and backgrounds cannot be applied to KPIs.
    A. Create a separate box element behind the title and subtitle to provide the border and background.
    30s
  • Q8
    What is the best practice for using slicers with KPIs that contain multiple visuals?
    Slicers cannot be used with KPIs that contain multiple visuals.
    A. Slicers can be applied without affecting the KPI line chart but will update all other metrics in the KPI.
    Slicers will update both the line chart and all other metrics in the KPI.
    Slicers only affect the line chart in KPIs with multiple visuals.
    30s
  • Q9
    What are some additional elements that can be included in a KPI to enhance its effectiveness?
    Additional elements will make the KPI calculations more complex.
    A. Padding to improve readability and visual separation between elements.
    Power BI does not allow for additional elements in KPIs.
    KPIs should only include essential metrics and visuals.
    30s
  • Q10
    How can drill-through functionality be implemented in a KPI to allow for further data exploration?
    Setting drill-through functionality requires modifying the data model.
    Drill-through is not available for KPIs in Power BI.
    Drill-through can only be applied to entire reports, not specific KPIs.
    A. Configure drill-through actions on individual metrics within the KPI.