placeholder image to represent content

Railway Opeartion

Quiz by Mae Elaine Mirando

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
42 questions
Show answers
  • Q1

    defined as the maximum number of trains that may be operated using concurrently a specific part of the infrastructure during a given time period and with a fixed level of service

    Marketing Department

    Operation Management

    Finance Department

    30s
  • Q2

    The number of trains that could run over a route during a specific time interval is mathematically calculated using an empirical formula. It represents an upper limit for line capacity.

    Available Capacity

    Theoretical Capacity

    Used Capacity

    Practical Capacity

    30s
  • Q3

    The difference between the Used Capacity and the Practical Capacity provides a useful indication of additional trains that could be handled by the network.

    Used Capacity

    Theoretical Capacity

    Practical Capacity

    Available Capacity

    30s
  • Q4

    Represents the practical limit of the number of trains (usually considering the current train mix, priorities, traffic bunching, etc.) that can be moved on a line in order to guarantee a reasonable level of reliability. It is a more realistic measure than theoretical capacity, usually around 60% - 75% of the latter.

    Available Capacity

    Practical Capacity

    Used Capacity

    Theoretical Capacity

    30s
  • Q5

    The actual traffic volume over the network is usually lower than the practical capacity.

    Used Capacity

    Practical Capacity

    Theoretical Capacity

    Available Capacity

    30s
  • Q6

    Railway Operation Result :

                          (Revenue/Pax)/Fare Rate

    Pax./KM

    Load Factor

    Seat-KM Offering

    No. of Pax

    Ave. Distance Travelled

    30s
  • Q7

    Railway Operation Result :

                                                         Actual Data

    Revenue

    Train KM

    KM. Train Run

    CAR KM

    Operating Days

    30s
  • Q8

    Railway Operation Result :

                                          Actual Data (North Ave-Taft) (16.9 km)

    Train KM

    CAR KM

    Operating Days

    Revenue

    KM. Train Run

    30s
  • Q9

    Railway Operation Result :

                                          KM Train Run x No. of Trip

    KM. Train Run

    Train KM

    Revenue

    Operating Days

    CAR KM

    30s
  • Q10

    Railway Operation Result :

                                          KM Train Run x No. of Car

    KM. Train Run

    Revenue

    Train KM

    CAR KM

    Operating Days

    30s
  • Q11

    Railway Operation Result :

                                        Actual Data or ( Fare Rate/km) x (pax. KM)

    KM. Train Run

    Operating Days

    Train KM

    Revenue

    CAR KM

    30s
  • Q12

    Railway Operation Result :

                                        Train Cap. x Train KM

    Ave. Distance Travelled

    Load Factor

    Seat-KM Offering

    No. of Pax

    Pax./KM

    30s
  • Q13

    Railway Operation Result :

                          Actual Data or (pax./KM) X (Ave. distance travelled/pax)

    Ave. Distance Travelled

    Seat-KM Offering

    No. of Pax

    Pax./KM

    Load Factor

    30s
  • Q14

    Railway Operation Result :

                          LF x Seat-KM Off. or No of pax  x Ave. distance travel

    Pax./KM

    Ave. Distance Travelled

    Load Factor

    Seat-KM Offering

    No. of Pax

    30s
  • Q15

    Railway Operation Result :

                          Pax-KM/ Seat-km off.

    Load Factor

    Ave. Distance Travelled

    Seat-KM Offering

    Pax./KM

    No. of Pax

    30s

Teachers give this quiz to your class