
Technical Drafting 9 and 10 SPA Quarter 4 Lesson 2 Assessment 2
Quiz by Jussa Leilady Alberba
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
Match the words to their corresponding meaning
Match the words to their corresponding meaning
Match the words to their corresponding meaning
This is often referred to as the collection line because it receives discharges of soil and washes within the building. It is classified into different types.
Type of Drain
Type of Drain
Type of Drain
Type of Drain
Identify the numbered 1 part of the Septic tank.
Identify the numbered 2 part of the Septic tank.
Identify the numbered 3 part of the Septic tank.
Identify the numbered 4 part of the Septic tank.
Identify the numbered 5 part of the Septic tank.