
TLE 10 - EPAS
Quiz by CID Marikina
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
Directions: Read each item carefully. Choose the letter of the correct answer.
Which handtool in Electronics is use to pump the melted lead on the PCB with the aid of soldering iron for troubleshooting and repair purposes?
Handtools are classify according to its function. What classification of tools are needed in constructing wire joints and connections?
PCB design making can be done by the use of masking tape and permanent pen in lay-outing circuit diagrams. Analyze the given steps below and identify which is the 3rd. steps.
What is the fourth steps during the etching process of PCB?
Upon checking your etched PCB, you found out that there is a cut on the layout circuit that happened during cutting of excess masking tape. What is the best action you should take?
Which process is needed before mounting the components on the PCB?
What method of soldering in which a solder paste is used temporarily to attach one or thousands of tiny electronic component to their contact pads after which it is subjected to controlled heat.
It is a waste hierarchy that should be taken to minimize the amount of waste generated from the community and industry.
Some discarded materials like newspaper can be made into new products to avoid using of raw materials.
Waste from Electrical/Electronic Equipment such as microwave-oven, small kitchen appliance, and consumer electronic equipment are under what category of the Philippine Electronics Code.
It is a centralized source of information containing a list of items used to manufacture a product and the description of individual components and materials.
It is usually a task or a job for a customer that can be assigned or scheduled to someone in a form of product or services.
You have bought an electric fan and acquire documents, What do you think are the primary procedures for you to understand the operations of the item. What will be the 4th procedures?
Analyze two words below that will conceptualize a procedure applied during pre-testing of an appliance.Â
CLUE: Operate, Inspection, Interview, Testing, Visual
Which of the pre-testing procedures in diagnosing defects of an appliance should be the 2nd step.
Which of the following action shows good conduct of a professional Technician in accepting repair of an appliance?
Which of the PPE is made to minimize the risk of injury occurring in the working area.
Which is the fourth procedures in identifying type of hazard in the workplace.
What do you call the ability to provide exact value or acceptable parameters to replacement of parts?
Arrange the Reassembling procedures for Electric fan.by writing the exact order of procedures below.
1. Fix all the disassembled parts in the housing compartment
2. All sides of the housing should fit accordingly
3. After replacing the defective components of the appliance, prepare the parts for re-assembly.
4. Wires and loose parts should be in proper place to avoid damage.
After the assembly of the electric fan, you will observe its functionality. State your observation when you press 3 on the selector switch of the fan.
In pre-testing of repaired electric fan, continuity test is the first thing to do, Which of the procedures below should be the last?
Which method of heat transfer to the appliances is by the movement of heat through a material or the material itself.
It is a household cooking appliance designed for small to medium quantity of food for heating with the use of heating element material and by baking using convection method.
Which is a common factor that affects the three processes, the conduction, convection and convection –radiation?
The possible caused of the trouble No power in Microwave oven is the internal fuse. What other component may lead to the trouble?
What is the condition of heat in the microwave oven if the magnetron is defective?
What is the possible cause if the microwave oven has No power at the Low voltage transformer on PCB?
He invented the rice cooker in December 1956?
What company first to produce rice cooker in 1945 consist of aluminum pot with coil inside with no automatic turn off.
A part of the rice cooker that turns off the cooking cycle and starts the warming mode cycle when it senses that the bottom of the rice cooker pan reach 134°C±6°C.
Which part of the rice cooker open the circuit when the temperature has gone unusually high?
The following will happen when the center thermostat outer spring will be compressed causing the switch button to depressed. Which scenario of switch on preventive system is the last?
When the pan is not place within the rice cooker, the center thermostat is not depressed. Which is true about this condition?
Jonathan conducted a test to see if the rice cooker will turn off automatically 1 minute before or after steam generation comes to a stop. .Which test is done?
Which test should be done if there is a poor contact between pan and heater plate?
Mrs. Ramos noticed that her rice cooker is functioning but it burns or overcooked rice several times. The suspected defective part is the switch lever, What procedure should the technician follow?
It is a glass part of an electric lighting device develop as an onion shape.
It is a bright light produced by electricity flowing through a tube filed with ionized gas.
Which statement best describe a CFL (Compact Fluorescent Lamp)
It is a light that is scattered to fall on the crop from all sides and evenly distributed, leaving no sharp shadows.
 Which is NOT a possible cause of flickering lights?
It is a bright light produced by electricity flowing through a tube filed with ionized gas.
Romeo is watching Television wherein tripping circuit breaker happens at home. Which is TRUE about tripping circuit breaker?
To prevent electric shock from equipment, the following precautionary measures should be applied except one.Â
 This PPE is use to protect the Technician from electrical hazards especially during repair and maintenance.
Which is True about defective parts replacement for repair an old LED bulb light?
In re-assembling electric fluorescent light in their correct order, .which is the fourth procedure?
Which among the jumbled procedures in re-assembling fluorescent bulb is the 7th?
What circuit diagram is shown below?