- Q1
The following are the steps on finding the needed CHB for a particular project except ONE.
compute for the number of CHB
convert meter into feet
find the aggregate area
compute for the number of cement
30s - Q2
To convert inches to centimeter multiply by__________.
3.54
35.4
2.54
25.4
30s - Q3
One mile is equal to ___________ feet.
5480
5280
5580
5380
30s - Q4
It is the ratio of the distance on the map or drawing and the distance on the ground.
formula
series
scale
ratio
30s - Q5
To convert meter into centimeter, multiply by _______.
100
10,000
1,000
10
30s - Q6
The drawing or figure of the original dimensions of a lot becomes smaller if the scale is changed to a bigger value.
maybe yes
maybe no
false
true
30s - Q7
The drawing or figure of the original dimensions of a lot becomes larger if the scale is changed to a smaller value from the original (very first) scale.
false
maybe no
true
maybe yes
30s - Q8
An artificial body of water surrounded by dikes and with accessories such as gates, pipes, and canals to facilitate water supply management is called_________
fishponds
beaches
dikes
lakes
30s - Q9
The following are the types of compartments/units of fishponds EXCEPT ONE.
breeding pond
transition pond
ponds serum
nursery pond
30s - Q10
It is a vertical support for wooden gates where wooden walls are nailed.
braces
floors
pillars
walls
30s - Q11
A unit of pond intended for confining fish fry to fingerlings size.
breeding
catching
rearing
nursery
30s - Q12
It is constructed near the nursery pond and the bottom is a little bit lower for easy transfer of fry or fingerlings for storage or acclimation.
rearing pond
transition pond
breeding pond
catching pond
30s - Q13
It served as a reservoir or was used for storing.
head pond
rearing pond
transition pond
nursery pond
30s - Q14
A device used to supply oxygen or break up the water surface affects the fast transfer of oxygen from the air to water during which time in the pond is at the critical level.
aerator
canals
screen
pump
30s - Q15
The additional height of a structure, e.g. main dike, above high- water level to prevent overflow is called ______
freeboard
catwalk
screen
braces
30s