TOP, PRC+CIP
Quiz by Nghiep Hy
Feel free to use or edit a copy
includes Teacher and Student dashboards
Measure skillsfrom any curriculum
Measure skills
from any curriculum
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
With a free account, teachers can
- edit the questions
- save a copy for later
- start a class game
- view complete results in the Gradebook and Mastery Dashboards
- automatically assign follow-up activities based on students’ scores
- assign as homework
- share a link with colleagues
- print as a bubble sheet
Our brand new solo games combine with your quiz, on the same screen
Correct quiz answers unlock more play!
10 questions
Show answers
- Q11. Which of the following entities shall comply with each operating instruction by its Transmission Operator unless such an action cannot be implemented?Reliability Coordinator/ Interchange AuthorityBalancing Authority/ Distribution Provider60sEditDelete
- Q22. Following a Contingency or other event that results in an IROL violation, the Transmission Operator shall return its transmission system to within IROL limits as soon as possible, but not longer than:45 minutes30 minutes15 minutes60 minutes60sEditDelete
- Q33. Each Balancing Authority shall have an Operating Plan(s) for the next‐day that addresses?Demand patterns/ Interchange schedulingTransmission ratings/ Breaker status60sEditDelete
- Q44. Each Transmission Operator shall operate so that instability, uncontrolled separation, or cascading outages will not occur as a result of:Market eventsThe most severe single contingencyWeather conditionsMultiple contingencies60sEditDelete
- Q55. If an overload on a transmission facility or abnormal voltage or reactive condition persists and equipment is endangered, which of the following actions shall a Transmission Operator take?Disconnect the affected facilityShed loadContact its Reliability CoordinatorUtilize economic dispatch60sEditDelete
- Q66. The main purpose and design for automatic underfrequency load shed protection is to:Prevent a voltage collapsePrevent system lossesHalt a decline of frequencyHalt a high frequency excursion60sEditDelete
- Q77. What is the main purpose and design of an Undervoltage Load Shed program is to prevent a:Dynamic instabilityHigh voltage conditionVoltage instability issueCollapse in frequency60sEditDelete
- Q88. Each Transmission Operator shall coordinate Protection Systems on major transmission lines and interconnections with which of the following neighboring entities?Transmission Service ProvidersReliability CoordinatorsLoad Serving EntitiesBalancing Authorities60sEditDelete
- Q99. The logical border surrounding a network to which Critical Cyber Assets are connected and for which access is controlled is a:Physical Security AreaElectronic Security PerimeterCyber Asset PerimeterCritical Cyber Border60sEditDelete
- Q1010. Which of the following programs reinforces cyber security practices (which may include associated physical security practices) for the Responsible Entity’s personnel who have authorized electronic or authorized unescorted physical access to BES Cyber SystemsPersonnel Risk AssessmentSecurity AwarenessElectronic Security PerimeterInteractive Remote Access Management60sEditDelete