placeholder image to represent content

TOP, PRC+CIP

Quiz by Nghiep Hy

Feel free to use or edit a copy

includes Teacher and Student dashboards

Measure skills
from any curriculum

Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.

With a free account, teachers can
  • edit the questions
  • save a copy for later
  • start a class game
  • view complete results in the Gradebook and Mastery Dashboards
  • automatically assign follow-up activities based on students’ scores
  • assign as homework
  • share a link with colleagues
  • print as a bubble sheet

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
10 questions
Show answers
  • Q1
    1. Which of the following entities shall comply with each operating instruction by its Transmission Operator unless such an action cannot be implemented?
    Reliability Coordinator/ Interchange Authority
    Balancing Authority/ Distribution Provider
    60s
    Edit
    Delete
  • Q2
    2. Following a Contingency or other event that results in an IROL violation, the Transmission Operator shall return its transmission system to within IROL limits as soon as possible, but not longer than:
    45 minutes
    30 minutes
    15 minutes
    60 minutes
    60s
    Edit
    Delete
  • Q3
    3. Each Balancing Authority shall have an Operating Plan(s) for the next‐day that addresses?
    Demand patterns/ Interchange scheduling
    Transmission ratings/ Breaker status
    60s
    Edit
    Delete
  • Q4
    4. Each Transmission Operator shall operate so that instability, uncontrolled separation, or cascading outages will not occur as a result of:
    Market events
    The most severe single contingency
    Weather conditions
    Multiple contingencies
    60s
    Edit
    Delete
  • Q5
    5. If an overload on a transmission facility or abnormal voltage or reactive condition persists and equipment is endangered, which of the following actions shall a Transmission Operator take?
    Disconnect the affected facility
    Shed load
    Contact its Reliability Coordinator
    Utilize economic dispatch
    60s
    Edit
    Delete
  • Q6
    6. The main purpose and design for automatic underfrequency load shed protection is to:
    Prevent a voltage collapse
    Prevent system losses
    Halt a decline of frequency
    Halt a high frequency excursion
    60s
    Edit
    Delete
  • Q7
    7. What is the main purpose and design of an Undervoltage Load Shed program is to prevent a:
    Dynamic instability
    High voltage condition
    Voltage instability issue
    Collapse in frequency
    60s
    Edit
    Delete
  • Q8
    8. Each Transmission Operator shall coordinate Protection Systems on major transmission lines and interconnections with which of the following neighboring entities?
    Transmission Service Providers
    Reliability Coordinators
    Load Serving Entities
    Balancing Authorities
    60s
    Edit
    Delete
  • Q9
    9. The logical border surrounding a network to which Critical Cyber Assets are connected and for which access is controlled is a:
    Physical Security Area
    Electronic Security Perimeter
    Cyber Asset Perimeter
    Critical Cyber Border
    60s
    Edit
    Delete
  • Q10
    10. Which of the following programs reinforces cyber security practices (which may include associated physical security practices) for the Responsible Entity’s personnel who have authorized electronic or authorized unescorted physical access to BES Cyber Systems
    Personnel Risk Assessment
    Security Awareness
    Electronic Security Perimeter
    Interactive Remote Access Management
    60s