Unit 106: Introduction to emerging technologies in construction and the built environment sector
Quiz by Matthew Shearman
Feel free to use or edit a copy
includes Teacher and Student dashboards
Measure skillsfrom any curriculum
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
- edit the questions
- save a copy for later
- start a class game
- automatically assign follow-up activities based on students’ scores
- assign as homework
- share a link with colleagues
- print as a bubble sheet
- Q1
Which BIM dimension includes the construction sequencing? Select one.
1D
4D
2D
3D
30s - Q2
Which one of the following is not part of the BIM life cycle?
Design
Plan
Maintain
Analyse
30s - Q3
Where would you find a BIM protocol:
Within the Precontract BIM Execution Plan
Within the Construction Operations Building Information Exchange (COBie)
Within the Construction Contract
Within the 3D modelling data
30s - Q4
Which one of the following is a term used to describe 3D printing?
Asset Information Modelling (AIM)
Project Information Modelling (PIM)
Computer Aided Manufacturing (CAM)
Additive Manufacturing(AM)
30s - Q5
Which one of the following is a definition of AR?
A digital simulation that you can interact with
A computer-simulated ‘enhancement’ of real life
A model that can provide graphical information
Combines both Virtual and Augmented Reality
30s - Q6
Which one of the following can be added to concrete to give it ‘self-healing’ properties?
Bio-degradablepaste
Quartzcrystals
Bacterial solution
Hempfibres
30s - Q7
Which one of the following statements about TransparentAluminium (Aluminium Oxynitride) is correct?
Is a strong ceramic
Is a type of graphene
Is a clear metal
Is self-healing
30s - Q8
1. Which one of the following off-site construction systems are used when bathroom or kitchen pods are installed into the construction?
Components
Panelised open systems
Volumetric units
30s - Q9
Which one of the following is not a benefit of off-site construction?
Sustainability
Customisation
Value
Efficiency
30s - Q10
What does BIM represent?
Builders Information Modelling
Building Important Modelling
Builders Important Modelling
Building Information Modelling
30s