2nd batch: Feasibility Study
Quiz by Shirley Anak Rufus
Feel free to use or edit a copy
includes Teacher and Student dashboards
Measure skillsfrom any curriculum
Measure skills
from any curriculum
Tag the questions with any skills you have. Your dashboard will track each student's mastery of each skill.
With a free account, teachers can
- edit the questions
- save a copy for later
- start a class game
- automatically assign follow-up activities based on students’ scores
- assign as homework
- share a link with colleagues
- print as a bubble sheet
9 questions
Show answers
- Q1Feasibility study is a recommendation report for an analysis of the viability of an idea after an exploratory work is conducted.TrueFalse120s
- Q2Pre- feasibility study is an opportunity to understand the issues at the proposed site, it also essential before a feasibility study performed because it may help sort out relevant scenarios, save time and money.FalseTrue120s
- Q3Before build a micro hydro power plant, feasibility study for the market and legal requirement are compulsory at the proposed site to determine the best location within a jurisdiction.TrueFalse120s
- Q4Selection of suitable technology and identification of competent candidate are required to handle the operation of a micro hydro power plant.TrueFalse120s
- Q5Construction of a micro hydro power plant needed an economic study to assess the expected benefits that impact on the local and general culture.TrueFalse120s
- Q6Consideration of site selection for a micro hydropower plant are as following, EXCEPTLarge catchment are and sufficient head.Transportation facilities of rail and road.Amount of villagers and habitat.Distance of the proposed site and load center.120s
- Q7Necessity to be considered in technical design of a micro hydro power system isLand use.Construction permits.Social and economic.Distance from the load centre.120s
- Q8Documentation of proper operations and maintenances are significant before implementation of a micro hydropower plant. It must be consider duringFinancial designEnvironmental designRegulatory designTechnical design120s
- Q9Selected site for a micro hydro power plant would NOT consider the following:Environmental designFinancial designTechnical designEconomical design120s