Know common plumbing preperation techniques

Quiz by Ricky Fleet

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
22 questions
Show answers
  • Q1
    Pipes passing from one floor to another in a multi storey building need to be...
    Insulated to prevent noise transmission
    Sealed to prevent the spread of fire
    Contain slip collars for access and inspection
    Identified with marking tape
    30s
  • Q2
    Other than using a heat matt to protect building fabric when using heat equipment, what other method can be used?
    Metal tools like a trowel
    Heat dissipating gel
    Dowse in water
    Foam spray
    30s
  • Q3
    When installing appliances and components, which document must be followed?
    Customers written instruction
    Work schedule
    Manufacturer's instructions
    Site plans
    30s
  • Q4
    A system that is taken out of service for maintenance or repairs is called...
    Permanent decommission
    Temporary decommission
    Permanent commission
    Temporary commission
    30s
  • Q5
    Before any new system is commissioned it must first be...
    Cleaned with wire wool
    Flushed out
    Isolated from all services
    Soundness tested
    30s
  • Q6
    What documentation must be handed over to the customer at the end of the job?
    Benchmark certificates and emergency contact number
    Invoice for labour and materials
    Manufacturer’s instructions, copies of tradesperson certificates
    Manufacturer’s instructions, Benchmark certificates and Building regulation compliance certificate
    30s
  • Q7
    How would you protect a customer’s lawn while carry materials across to access a property
    Use walking boards
    Use wheelbarrow
    Wear soft shoes
    Dust sheets
    30s
  • Q8
    When working in an existing building there is a chance the pipe work may be...
    Corroded
    Undersized for planned installation
    All of the above
    Imperial measurement
    30s
  • Q9
    What is the maximum diameter hole that can be drilled in a timber first-floor joist with a depth of 150mm?
    12mm
    57mm
    22mm
    37mm
    30s
  • Q10
    The maximum notch depth in a joist should not exceed...
    0.325 x depth
    0.425 x depth
    0.125 x depth
    0.225 x depth
    30s
  • Q11
    According to Building Regulations Approved document A, what would be the maximum permitted depth of vertical chase in a 100mm deep concrete block?
    10mm
    33mm
    25mm
    50mm
    30s
  • Q12
    Which one of the following does not form part of the commissioning process?
    Visual inspection
    Flushing the system
    Fitting a plumbing appliance
    Soundness testing
    30s
  • Q13
    Which one of the following parts of the Building Regulations deals with building structure?
    Part P
    Part L
    Part A
    Part G
    30s
  • Q14
    Which one of the following should be used to protect the area you are working in?
    Plywood
    Heat mat
    Safety shoes
    Dust sheets
    30s
  • Q15
    At what point should an inhibitor be added to a central heating system during commissioning?
    Before cleaning all the pipework
    During the first flush
    Before flushing
    During the final fill of the system
    30s