Calculate quantity of earth work for a 200m road with bank heights 1.00m and 1.60m, formation width 10m, side slope 2:1
30
3276 cu.m
4276 cu.m
3280 cu.m
2676 cu.m
Q 2/72
Score 0
Unit for excavation in M.K.S system
30
cu.m
m
sq.m
No
72 questions
Q.
Calculate quantity of earth work for a 200m road with bank heights 1.00m and 1.60m, formation width 10m, side slope 2:1
1
30 sec
Q.
Unit for excavation in M.K.S system
2
30 sec
Q.
Coarse aggregate quantity for 100m³ of 1:2:4 concrete
3
30 sec
Q.
Estimate prepared for additional works during progress
4
30 sec
Q.
Item rate estimate example
5
30 sec
Q.
Area of opening ignored in masonry calculation
6
30 sec
Q.
Density of mild steel
7
30 sec
Q.
Sand quantity for 100 cu.m of 1:2:4 concrete
8
30 sec
Q.
Cement quantity for 1st class brickwork (1:6 mortar)
9
30 sec
Q.
Equation for area by trapezoidal formula
10
30 sec
Q.
Estimation method using out-to-out and in-to-in measurements
11
30 sec
Q.
Equation for area by Simpson’s formula
12
30 sec
Q.
Mazdoor helpers required per mason
13
30 sec
Q.
Out-turn of mason constructing stone arch
14
30 sec
Q.
Measuring unit for cornice
15
30 sec
Q.
Steel percentage for rivets in roof truss
16
30 sec
Q.
Equation for volume by trapezoidal formula
17
30 sec
Q.
Specification describing workmanship/methods
18
30 sec
Q.
Plastering area calculation for a pillar
19
30 sec
Q.
Unit for damp proof course
20
30 sec
Q.
Minimum lift for earthwork excavation
21
30 sec
Q.
Specification for materials/work nature
22
30 sec
Q.
Minimum length for bill quantity
23
30 sec
Q.
Minimum height for 1st class building
24
30 sec
Q.
Estimate for maintaining structures
25
30 sec
Q.
Stone quantity for 100m³ rubble masonry
26
30 sec
Q.
Teak wood doors/windows specification
27
30 sec
Q.
Unit for modern door/window frames
28
30 sec
Q.
Plinth material for 1st class building
29
30 sec
Q.
Damp proof course specification (2cm 1:2:4)
30
30 sec
Q.
Estimate when original exceeds 5%
31
30 sec
Q.
Property value in open market
32
30 sec
Q.
Valuation method: Capitalized value = Net income x YP
33
30 sec
Q.
Schedule of rates preparer
34
30 sec
Q.
Valuation: Capitalized value = Cost - Depreciation
35
30 sec
Q.
Data necessary for estimate preparation
36
30 sec
Q.
Minimum area for bill quantity
37
30 sec
Q.
Unit for soiling layer
38
30 sec
Q.
Nominal bricks for 1m³ brickwork
39
30 sec
Q.
Paint quantity for 100 sq.m (one coat)
40
30 sec
Q.
Estimate for 10% expenditure excess
41
30 sec
Q.
Deduction for openings in plastering
42
30 sec
Q.
Estimate for administrative sanction
43
30 sec
Q.
Rough cost estimate example
44
30 sec
Q.
Contractor’s profit percentage in rate analysis
45
30 sec
Q.
Process of determining property value
46
30 sec
Q.
Cement for 100 sq.m DPC (2.5cm 1:1.5:3)
47
30 sec
Q.
Concrete mix for 1st class DPC
48
30 sec
Q.
Minimum lead for earthwork excavation
49
30 sec
Q.
Aggregate specification
50
30 sec
Q.
What (%) percentage is added as contingencies in approximate estimate?
51
30 sec
Q.
Which class of building specification that doors and windows frame shall be made of teak wood?
52
30 sec
Q.
Which is an item rate estimate?
53
30 sec
Q.
What is the name of specification gives description of work quantity, proportion, workmanship and execution method etc?
54
30 sec
Q.
How aggregate is specified?
55
30 sec
Q.
What is printed list of rates of various items of work maintained by the engineering department?
56
30 sec
Q.
Which method of valuation is capitalized value = Actual cost of construction - Depreciation?
57
30 sec
Q.
What is the name of estimate is prepared in additional works are required during the progress of work?
58
30 sec
Q.
How to calculate quantity cement for 1st class brick work in super structure with (19x9x9) cm brick with 1:6 cement sand mortar - unit 1 cum take 10 cu.m?
59
30 sec
Q.
What quantity of stone is required for 100m³ of rubble masonry?
60
30 sec
Q.
Which estimate is required for administrative sanction?
61
30 sec
Q.
What quantity bitumen is required for 100m² first coat painting on DPC?
62
30 sec
Q.
What is the name of estimate prepared to maintain the structure or work in safe condition?
63
30 sec
Q.
What is the sequence of booking measurements?
64
30 sec
Q.
What is the name of specification gives nature and class of work and material to be used in the various parts of the work?
65
30 sec
Q.
Which is rough cost estimate?
66
30 sec
Q.
What is the out-turn of mason, constructing superstructure with brick masonry?
67
30 sec
Q.
What is the value of dismantled material?
68
30 sec
Q.
What is the minimum cubical quantity for bill quantity calculation?
69
30 sec
Q.
What is the annual periodic payment for repayment of the capital amount invested by a party?
70
30 sec
Q.
What is the out-turn of mason constructing stone arch work?
71
30 sec
Q.
What is the equation for computation of volume by prismoidal formula?