Prepare and set up tools and materials for drawing 2.1 Observe OHS policies and procedures in setting-up tools and materials for drawing 2.2 Prepare drawing tools, materials and equipment based on job requirements 2.3 Set up tools, materials, and equipment based on the job requirements
Track each student's skills and progress in your Mastery dashboards
Loading...
Loading...
Loading...
Q 1/5
Score 0
An area of land for construction or the lot on which a building is constructed.
30
open lot
site
through lot
corner lot
Q 2/5
Score 0
A drawing tool used to draw horizontal lines and serves as guide for triangles in drawing vertical and inclined lines.
30
Users enter free text
Give this quiz to my class
5 questions
Q.
An area of land for construction or the lot on which a building is constructed.
1
30 sec
TLE_ICTTD9- 12AL-Ib-2
Q.
A drawing tool used to draw horizontal lines and serves as guide for triangles in drawing vertical and inclined lines.
2
30 sec
TLE_ICTTD9- 12AL-Ib-2
Q.
A triangle is an instrument used for drawing vertical and oblique lines
3
30 sec
TLE_ICTTD9- 12AL-Ib-2
Q.
The best instrument used for dividing lines or distance into equal parts.
4
30 sec
TLE_ICTTD9- 12AL-Ib-2
Q.
Before the start of the drafting activity: Setting-up of drafting tools,
materials, and equipment