REMA - MAINTENANCE

Quiz by Mae Elaine Mirando

Our brand new solo games combine with your quiz, on the same screen

Correct quiz answers unlock more play!

New Quizalize solo game modes
43 questions
Show answers
  • Q1

    A _____________ is a large system made up of various subsystems with facilities and equipment.

    Track

    System

    Railway

    30s
  • Q2

    designed to help determine the condition of in-service equipment in order to predict when it is going to fail, therefore it is not a matter of likelihood, but a highly detailed forecast is ensured.

    Preventive Railway Maintenance

    Predictive Railway Maintenance

    Corrective Railway Maintenance

    30s
  • Q3

    It is a task regularly performed to monitor the status or the conditions of a railway equipment to lessen the likelihood of its failure

    Corrective Railway Maintenance

    Preventive Railway Maintenance

    Predictive Railway Maintenance

    30s
  • Q4

    It is a task performed to identify, isolate, and resolve a fault so that a failed equipment can be replaced or restored to an operational condition within the tolerances or limits established for in-service operations.

    Corrective Railway Maintenance

    Preventive Railway Maintenance

    Predictive Railway Maintenance

    30s
  • Q5

    a system of wires that supplies electricity to vehicles like trams, locomotives, and light rail vehicles that have a pantograph

    Pantograph

    Third Rail

    Catenary Overhead line

    30s
  • Q6

    also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway track

    Catenary

    Overhead line

    Pantograph

    Third Rail

    30s
  • Q7

    a special devices mounted on electric trains to collect current from one or several contact wires.

    Overhead line

    Third Rail

    Pantograph

    Catenary

    30s
  • Q8

    Railway system that uses third rail to power the system

    LRT

    PNR

    MRT

    30s
  • Q9

    Railway system that uses diesel engine

    MRT

    PNR

    LRT

    30s
  • Q10

    Railway system that uses catenary to power the system

    MRT

    PNR

    LRT

    30s
  • Q11

    document that allows the maintenance crew to proceed on conducting maintenance activity in the railway. 

    ​Work Permit

    Company Profile

    Work Method Statement

    Shop drawing

    30s
  • Q12

    an approved document that describes a step-by-step manner, of how a specific task should be done. It comprises clear instructions, methods, parts, or tools on how to carry out the maintenance. 

    Work Method Statement

    Shop drawing

    ​Work Permit

    Company Profile

    30s
  • Q13

    detailed plans that show how to manufacture, assemble, install, or fabricate prefabricated components. This fabrication is produced by the contractor, supplier, manufacturer, subcontractor, consultants, or fabricator

    Shop drawing

    Work Permit

    Company Profile

    Work Method Statement

    30s
  • Q14

    document includes information about the company's history, mission, vision, products or services rendered, target market, team members, achievements, pricing information, and more.

    Shop drawing

    Company Profile

    ​Work Permit

    Work Method Statement

    30s
  • Q15

    LRT & MRT rail gauge

    1067 mm

    1435 mm

    1607 mm

    1453 mm

    30s