A _____________ is a large system made up of various subsystems with facilities and equipment.
designed to help determine the condition of in-service equipment in order to predict when it is going to fail, therefore it is not a matter of likelihood, but a highly detailed forecast is ensured.
It is a task regularly performed to monitor the status or the conditions of a railway equipment to lessen the likelihood of its failure
It is a task performed to identify, isolate, and resolve a fault so that a failed equipment can be replaced or restored to an operational condition within the tolerances or limits established for in-service operations.
a system of wires that supplies electricity to vehicles like trams, locomotives, and light rail vehicles that have a pantograph
also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway track
a special devices mounted on electric trains to collect current from one or several contact wires.
Railway system that uses third rail to power the system
Railway system that uses diesel engine
Railway system that uses catenary to power the system
document that allows the maintenance crew to proceed on conducting maintenance activity in the railway.
an approved document that describes a step-by-step manner, of how a specific task should be done. It comprises clear instructions, methods, parts, or tools on how to carry out the maintenance.
detailed plans that show how to manufacture, assemble, install, or fabricate prefabricated components. This fabrication is produced by the contractor, supplier, manufacturer, subcontractor, consultants, or fabricator
document includes information about the company's history, mission, vision, products or services rendered, target market, team members, achievements, pricing information, and more.
LRT & MRT rail gauge
A Narrow Gauge railway is a railway with a track gauge of _____
PNR rail gauge
A Standard Gauge railway is a railway with a track gauge of
where passengers having a stored value ticket can increase the residual value.
It automates the ticket accounting and selling processes and it can give detailed data on system usage
where passengers can buy a ticket for their journey.
used by railway staff to issue tickets at stations
which come in a number of varieties (according to the system in use) but which all have electronically encoded data content indicating the validity and/or use.
which form a barrier between the "unpaid" area of the station and the "paid" area where passengers must possess a valid ticket.
It will read and release the gate when a valid ticket is presented.
MRT 3 overhead is __________
LRT 1 overhead is __________
LRT 2 overhead is __________
The sand provides additional friction between the steel train wheels and rails to improve traction and reduce slippage of the wheels on the metal rail.
is a container on most locomotives, multiple units and trams that holds sand, which is dropped on the rail in front of the driving wheels in wet and slippery conditions and on steep grades to improve traction.
they are the one that involves testing products to ensure they meet standards for safety and efficacy.
system used to control the movement of railway traffic
used to extinguish, control, or in some cases, entirely prevent fires from spreading or occurring. Example : sprinkler, fire house etc
an assembly of four or six wheels forming a pivoted support at either end of a railway coach. It provides flexibility on curves.
they are the one that involves the design of processes, such as documenting standard operating procedures (SOPs) according to ISO 9000 standards.
plants, flower or plantation in the railway facilities
facilities that stop to load or unload freight or passenger
used for washing trains, locomotives, wagons, subways, trams, etc. with the passage of the vehicle at constant speed or the movement of washing devices over the fixed vehicle.
equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses
This rail track maintenance is conducted in case of some major issues. It is carried out in case of train accidents, track component replacement, etc.
This maintenance is carried out throughout the year on a daily basis. It involves a daily track inspection, regular maintenance of track fittings, cleaning, oiling etc.
It is carried out on a routine basis repeatedly.
is conducted by departmental labor after every 2 to 3 years. Thi maintenance involves maintenance of track alignment, rails, gauge, points & crossings, drainage, approaches, etc.