How do you identify the planned outage area?
How would you know there is a requirement for a switching program to be completed?
How could you confirm the implications of the switching program on the power generation system?
What systems provide you with nominal and applicable electrical plant loading limits?
Who needs to be consulted when planning an electrical plant outage?
What governing manual is used by Synergy to ensure compliance with the relevant legislation applicable with isolating and earthing plant?
What is the minimum approach distance for 132kV for authorised persons?
How could you confirm in the isolation process that a circuit has been de-energised and there is no back feed?
When is it permissible to not use a switching program?
When interconnected plant is isolated for maintenance, what portion of the maintenance access permit aligns with the “Limits of Isolation” listed on the switching program?
Once a Switching Program is drafted by an authorised person, who is authorised to verify the accuracy of it?
Where should completed internal switching programs be stored?
What documentation assists you to determine appropriate HV network configurations.
Who should  be consulted when planning to respond to an unexpected loss of supply to a portion of the plant?
A local 11kV Volt meter is indicating 0V, but the remote indication is indicating 11kV, what is a reasonable response?
When genuine emergency fault response is assessed, as needed by senior operations or engineering staff for internal plant, what process should be followed?
During Switching activities, you come across plant that is labelled differently and doesn’t align with the plant drawings, what should you do?
A switching program operation requests you to operate the incoming transformer feeder circuit breaker on the 440V Stockout Switchboard (being circuit 27),what label would you expect next to it?
How do you identify possible hazards in the switching that you are about to conduct?
Whilst carrying out a Switching Program or simple isolation, you find a problem that prevents you from completing the next step; What action would you take?